Plan last-time-buy and EOL sourcing with full MPN control.

End-of-life sourcing combines lifecycle verification, remaining demand, package and suffix control, date-code requirements and alternative planning. The available path must be confirmed for each project.

01

Demand review

Required quantity, consumption horizon and target dates are defined.

02

Order-code verification

Package, suffix, temperature and qualification level are checked.

03

Continuity planning

Potential last-buy, extended sourcing or alternative options are compared.

WORKFLOW

Turn an EOL notice into a sourcing and continuity plan.

  1. 01

    Confirm the EOL status

    Check the exact MPN and manufacturer lifecycle information.

  2. 02

    Quantify remaining demand

    Define production, service and safety-stock requirements.

  3. 03

    Review supply and alternatives

    Compare evidence, timing, risk and engineering impact.

  4. 04

    Document the decision

    Record the approved option, exceptions and inspection scope.

CONFIRM BEFORE ORDER

EOL planning inputs

Lifecycle status changes over time. Recheck the exact MPN against current manufacturer information before making a purchasing decision.