Skip to content
Global electronic component sourcing
+852 5808 3333chain@chaintechltd.com

SHORTAGE & ALLOCATION

Respond to lead-time and allocation pressure without losing control.

Shortage sourcing starts with the true production constraint: exact MPN, quantity by date, approved alternatives, packaging, quality evidence and the commercial limit for each required delivery window.

01

Priority schedule

Required quantities are separated by delivery window and production impact.

02

Multi-source review

Possible supply routes are compared with a consistent risk and evidence checklist.

03

Controlled alternatives

Substitutions are considered only within customer-approved engineering rules.

WORKFLOW

Move from shortage list to prioritized sourcing action.

  1. 01

    Prioritize constrained lines

    Identify line-stop risk, minimum quantity and target delivery.

  2. 02

    Search supply options

    Review source type, location, package, date code and timing.

  3. 03

    Confirm quality scope

    Agree documentation and inspection needs for the proposed option.

  4. 04

    Approve phased supply

    Document price, quantity, timing, exceptions and alternatives.

CONFIRM BEFORE ORDER

Shortage enquiry inputs

Do not substitute a component solely because the headline description appears similar. Engineering approval remains essential.

RFQ